PROUDLY BRINGING SOLAR POWER TO COCHISE COUNTY

Jobs

Revenues

Energy

Our Projects

.
Our projects will provide clean, abundant, and affordable energy to Arizona’s grid, supporting economic growth and welfare in the area.

Project Features

• Projects MWac: 75MWac
• Enough to power 15,000 homes
• Equivalent to 32,000 cars taken off the road
• Metric tonnes of CO2 saved per year 160,000

Good For Cochise County

.
The solar farms’ electricity will benefit rural communities and local industries through a power purchase agreement supporting rising local energy demands.

Project Benefits

Increase in local tax revenue during the project life
Job creation during construction
Prioritizing the use of local businesses
Improvement to local infrastructure
Home-grown energy to secure Arizona’s energy security

Land Stewardship Values

.
Horus is fully committed to responsible land management and stakeholder engagement.

Planned Environmental Enhancements

Preservation of soils for future agriculture use

Protection of endangered species

• Large wildlife corridors/open space preservation along site perimeter

• Wildlife-friendly fencing developed with AGFD

• Increase native plant biodiversity through the long-term land management

About Us

.

Dahlia Solar is a 75MWac solar farm site on c. 590 acres of land located near McNeal, Cochise County.

The total investment in the facility is estimated to be $120 million. The project has completed field studies, environmental engineering and preliminary design is in progress.

Dahlia Solar is estimated executing an interconnection agreement with APS in 2026, with construction to most likely begin at the start of 2027 and operations by mid-2028. The anticipated project life is 40-50 years.

Project Maps

click on the image to enlarge

click on the image to enlarge

click on the image to enlarge

click on the image to enlarge

click on the image to enlarge

click on the image to enlarge

Frequently Asked Questions

How much land is required for a solar farm?

A good rule of thumb is to allow five acres of land for every megawatt of solar power capacity. Horus may contract additional land to provide more flexibility for construction staging, site layout, and to account for non-developable areas on the landscape such as environmental features and to avoid existing infrastructure such as roads, wells, and residences.

Is the conversion of land to solar generation permanent?

No. At the end of the solar farm’s life, it will be decommissioned or repowered. If decommissioned, equipment such as the solar modules and racking could be recycled and salvaged. Solar installations use steel posts that are driven or screwed into the ground, but do not use concrete pilings. This means that the landowner can resume its operations onsite after the life of the approximately 40-50 year lifespan of the solar project.

What is the amount of land that would be taken out of agricultural production with the proposed project?

Within the project area, there is currently no land that is being irrigated.
During the life of the project, the land would be given a rest and preserved for future agriculture use. While the installation of a solar facility changes the land use of the property, the soil fertility is enhanced by planting grasses and other low-growth species beneath the panels, in turn, managing weed growth and reducing soil erosion. At the time of decommissioning, the land will be restored to its previous condition or intended future use.

Why has this land been selected for the solar farm as opposed to brown fields where there is no detriment to the impact of the land?

Horus does encourage the development on brown field sites where it makes sense, but there are not enough of them next to good transmission systems to meet the growing demand for renewable energy in the country. This site was first selected based on the existing 69kV transmission line on site as well as the landowners’ desire to lease land for solar energy generation, and to preserve their land for long-term future uses.

How much water a solar farm consumes as opposed to other sources of energy?

When compared to other typical land uses in the Project area, the project demonstrates a responsible use of Cochise County’s limited water resources. Solar PV systems require minimal water use during operation for cleaning of the PV panels to maintain energy output. The exact cleaning schedule is a function of precipitation, dust, and other particulate settling on the panels. To minimize cleaning, the Project intends to treat neighbouring roads with GMCO CS products, a blend of liquid magnesium chloride and a complex sugar. The product is an environmentally friendly solution for gravel road stabilization and dust control. This will reduce water consumption related to cleaning during the operation period. In addition, the Project plans to establish large water collection tanks near the location of the substation. While fire is not a typical concern for PV systems, these water tanks may be utilized by the Cochise Fire District and will provide a key resource for protection against fires in the region, especially in times of drought.

What if the solar farm operator changes ownership or has insufficient assets to decommission or reclaim the solar farm?

If the solar farm changes ownership, the new operator will be subject to all of the obligations Horus is bound by. Horus will commit to the requirements set forth by Cochise County Code and that are part of the SU permit approval. The project owner will be responsible for removing the electrical equipment, poles, piles, foundations and conduits, as well as access roads, fencing, groundcover, landscaping, and anything else installed as part of the project. As per the Decommissioning Plan established by the Cochise County Code, Horus must provide, a bond or letter of credit security in the amount sufficient to fund the decommissioning/reclamation costs. The property shall be restored to a condition reasonably similar to its condition prior to development of the major facility.

What is involved with day to day operations of the solar farm?

Solar farms are very passive in nature during the operations phase. The site will be visited periodically for operations and maintenance activities including regular operations site checks, vegetation maintenance, and environmental monitoring.

The site will be fenced for security and safety purposes and lighting will be placed at the main entrance gate and at key operational locations on the site. Security measures may also include CCTV, motion lights, anti-intrusion alarms, and dispatchable security guards.

What types of activities are expected during construction? How will dust be controlled?

Construction will include delivering equipment, site preparation, trenching the electrical collector system, and assembling and installing the solar modules and other electrical equipment. Horus will always try to minimize disruptions to a landowner’s surrounding operations. Dust palliatives, suppressant, or binders and water tankers will be used to help control dust while the construction activities are occurring on the site. During the construction of the facility, best management practices will be utilized to limit fugitive dust from being airborne and traveling beyond the property lines. Dust control efforts will be monitored by the site foreman on a regular basis to ensure fugitive dust is adequately controlled.

Do solar farms contain Hazardous Materials?

The primary materials in solar modules are glass, aluminum, silicone, copper, and trace semiconducting metals, which are all inert and don’t constitute hazardous materials or waste. There could be trace amounts of lead from soldering material, which is similar to televisions and cell phones. There is no risk of exposure of leakage and any amount contained in the modules is below the EPA limits.

How will vegetation and weeds be managed on the solar farm?

Periodic inspections of the project area during the beginning, middle, and end of the growing season will evaluate presence or absence, degree of invasion, and the response of previous treatments. Appropriate management actions will be implemented wherever noxious weed species are observed growing within the project area including identifying and managing noxious weeds, conducting pre-treatment and post-treatment evaluations, minimize the potential for transportation and importation of noxious weed species, educate field personnel in order to encourage compliance with weed management program goals and assist with identification and control efforts.

An Integrated Weed Management approach will be implemented for treatment of noxious weeds within the project area. An IWM approach enables selection of one or more weed management methods based on site specific environmental conditions and control needs. The following weed management methods will be considered for the project area: Chemical – application of appropriate herbicides by a licensed applicator (All herbicides will be applied in accordance with the manufacturer’s label and in accordance with Arizona laws).

There Will Be A Special Use Permit Hearing

.

September 11, 2024, at 4PM, 1415 W. Melody Lane, Building G
Bisbee, Arizona 85603

Contact

Use the contact form below to get in touch with us.